SO-ROUTER
Central routing layer that determines which approved energy path is active.
SO-EMS M02
M02 decides where measured energy should go.
M01 tells us what energy is moving. M02 uses that information to route energy between sources, storage, loads, recovery paths and experiments according to defined operating rules.
M02 PRINCIPLE
M02 is not an energy source.
It is the routing layer that manages available energy after M01 has established what is actually entering, leaving or being recovered.
ROUTING ARCHITECTURE
The M02 prototype begins as a protected low-voltage 12 V DC routing bench.
M02 CORE COMPONENTS
Central routing layer that determines which approved energy path is active.
Fuses, DC breakers, current limits and emergency-stop protection for each relevant energy path.
Relays, contactors or appropriate solid-state switching devices used to connect and isolate energy paths.
Control logic defining when energy may move between sources, batteries, loads and recovery paths.
ROUTING DESTINATIONS
Primary storage path with independent protection, measurement and controlled connection.
Secondary storage path allowing controlled dual-battery experiments and energy transfer strategies.
Loads that should receive priority when available energy becomes limited.
Research loads that may be disconnected when energy reserves fall below safe operating limits.
Controlled pathway for measured recovered energy returning from regenerative or experimental systems.
DUAL BATTERY ARCHITECTURE
Battery A and Battery B are treated as separate energy stores with independent protection, measurement and routing decisions.
This allows SO-EMS to observe what happens when one storage bank is supplying loads while another receives available charging energy.
Energy moved between batteries must pass through an appropriate controlled conversion or charging stage.
IMPORTANT ROUTING RULE
M02 does not assume that Battery A can simply be connected directly to Battery B.
Charging or transferring energy between storage banks requires controlled conversion, appropriate charging limits, protection and measurement.
The router decides the approved path. It does not bypass the electrical requirements of the storage system.
M02 MEASUREMENTS
Monitor available state of charge or another validated indicator of storage condition.
Measure renewable or other source energy available to the routing bus.
Measure energy required by critical and experimental loads.
Track recovered energy separately by source where practical.
Compare energy before and after converters or charging stages used by the router.
Record when routes changed so energy data can be tied to operating state.
SO-RULES
The first M02 rules should be understandable enough to test manually before they are automated.
When primary loads are satisfied and safe storage capacity remains available, route approved surplus energy toward the appropriate storage path.
When storage reaches a defined low-energy threshold, reduce or disconnect noncritical experimental loads before critical loads.
Route measured recovered energy only toward an available and electrically appropriate destination.
Do not route charge or discharge outside defined storage operating limits.
If the measurement or control state becomes unreliable, the router should move toward a defined safe state instead of guessing.
ROUTING DECISION MODEL
FIRST M02 TEST
The first M02 test evaluates controlled routing between two separately monitored storage banks and a defined electrical load.
The objective is not to demonstrate perpetual operation. It is to measure how routing decisions affect storage state, conversion losses, available energy and load continuity.
M02-T01 PROCEDURE
Record Battery A, Battery B, source availability and load conditions.
Confirm energy measurement channels are operating before any routing decision is tested.
Confirm fuses, current limits, switching states and emergency-stop behaviour.
Connect the defined source and storage path using the approved switching sequence.
Operate a defined load while recording energy flow.
Allow the system to reach the predefined condition that calls for a route change.
Execute the controlled switch to the alternate approved path.
Confirm measured current and energy are moving through the intended path after switching.
Quantify energy used, transferred and lost during the routing process.
Repeat the sequence before automating the routing rule.
SO-PROTECT
Switching logic does not replace overcurrent protection, suitable wiring, battery protection or appropriate charging control.
The low-voltage prototype should remain fused, current-limited where practical and equipped with an accessible emergency stop.
FAIL-SAFE STATES
Stop automatic route changes when the required measurement becomes unreliable.
Return switching devices to a defined safe state where the hardware permits it.
Preserve critical loads and disconnect experimental loads according to defined thresholds.
Provide a direct way to interrupt the experimental routing system.
M01 + M02
A routing decision should be confirmed by measurement after the switch. The command alone does not prove that energy actually followed the intended path.
SOURCE INTEGRATION
Route measured solar energy toward loads or available storage through appropriate charging equipment.
Solar Calculator →Measure recovered energy independently before routing it back toward an approved destination.
Route measured generation from useful water flow through a controlled conversion path.
Experimental energy sources remain separately measured so their contribution cannot be confused with primary generation.
RECOVERY BUS
Regenerative braking, micro-hydro, mechanical recovery or another experimental source can enter the Recovery Bus only after its contribution is measured.
This prevents recovered energy from being mistaken for primary generation.
M02 → CONTROL ROOM
M01 provides measured energy data. M02 adds context about where that energy was intentionally routed.
Future telemetry can therefore show not only how much energy moved, but which source, storage bank or load was active during that period.
Enter Control RoomRoute-state telemetry is not connected yet. The values shown here are the existing Sustainable Oasis Control Room energy dataset.
FUTURE M02 DATA RECORD
Record when the routing state changed.
Identify where energy originated.
Identify where energy was routed.
Record measured watt-hours transferred during the routing period.
Record which operating rule caused the routing change.
Record energy lost across converters or charging stages.
M02 DEVELOPMENT PATH
Test approved routes manually using M01 measurement.
Add protected electrical switching between validated routes.
Add simple rule-based decisions using validated measurements.
Record every route change and corresponding energy flow.
Connect route-state and measured energy data to the Sustainable Oasis digital layer.
NEXT MODULE
Together, the first three modules form the initial physical core of the SO-EMS architecture.
M03 takes the next step by formalizing how energy storage is characterized, protected, charged, discharged and measured.
SO-EMS M02