SO-EMS M02

Energy Router

M02 decides where measured energy should go.

M01 tells us what energy is moving. M02 uses that information to route energy between sources, storage, loads, recovery paths and experiments according to defined operating rules.

SOURCES M01 MEASURE M02 ROUTE M03 STORE

M02 PRINCIPLE

Measure first. Then decide where every watt should go.

M02 is not an energy source.

It is the routing layer that manages available energy after M01 has established what is actually entering, leaving or being recovered.

ROUTING ARCHITECTURE

One controlled DC bus. Multiple destinations.

The M02 prototype begins as a protected low-voltage 12 V DC routing bench.

SOURCE BUS M01 SO-ROUTER BATTERY A BATTERY B LOAD BUS RECOVERY BUS

M02 CORE COMPONENTS

Routing requires protection, switching and rules.

ROUTE

SO-ROUTER

Central routing layer that determines which approved energy path is active.

SAFE

SO-PROTECT

Fuses, DC breakers, current limits and emergency-stop protection for each relevant energy path.

SWITCH

SO-SWITCH

Relays, contactors or appropriate solid-state switching devices used to connect and isolate energy paths.

LOGIC

SO-RULES

Control logic defining when energy may move between sources, batteries, loads and recovery paths.

ROUTING DESTINATIONS

M02 sends available energy where it creates the most value.

STORAGE A

Battery A

Primary storage path with independent protection, measurement and controlled connection.

STORAGE B

Battery B

Secondary storage path allowing controlled dual-battery experiments and energy transfer strategies.

LOAD

Critical Loads

Loads that should receive priority when available energy becomes limited.

EXPERIMENT

Experimental Loads

Research loads that may be disconnected when energy reserves fall below safe operating limits.

RECOVERY

Recovery Bus

Controlled pathway for measured recovered energy returning from regenerative or experimental systems.

DUAL BATTERY ARCHITECTURE

Two batteries should remain independently visible.

Battery A and Battery B are treated as separate energy stores with independent protection, measurement and routing decisions.

This allows SO-EMS to observe what happens when one storage bank is supplying loads while another receives available charging energy.

Energy moved between batteries must pass through an appropriate controlled conversion or charging stage.

M02 STORAGE ROUTING Dual Battery Model
R&D
BATTERY A SOC state of charge
BATTERY B SOC state of charge
ACTIVE PATH A/B routing state
TRANSFER Wh measured energy

IMPORTANT ROUTING RULE

Do not connect battery banks together blindly.

M02 does not assume that Battery A can simply be connected directly to Battery B.

Charging or transferring energy between storage banks requires controlled conversion, appropriate charging limits, protection and measurement.

The router decides the approved path. It does not bypass the electrical requirements of the storage system.

M02 MEASUREMENTS

Routing decisions need measured context.

SOC

Storage State

Monitor available state of charge or another validated indicator of storage condition.

SOLAR

Source Input

Measure renewable or other source energy available to the routing bus.

LOAD

Load Demand

Measure energy required by critical and experimental loads.

REC

Recovery Input

Track recovered energy separately by source where practical.

LOSS

Conversion Loss

Compare energy before and after converters or charging stages used by the router.

TIME

Routing History

Record when routes changed so energy data can be tied to operating state.

SO-RULES

Begin with simple, explainable routing logic.

The first M02 rules should be understandable enough to test manually before they are automated.

RULE 01

Surplus Source Energy

When primary loads are satisfied and safe storage capacity remains available, route approved surplus energy toward the appropriate storage path.

RULE 02

Preserve Critical Loads

When storage reaches a defined low-energy threshold, reduce or disconnect noncritical experimental loads before critical loads.

RULE 03

Recovery Routing

Route measured recovered energy only toward an available and electrically appropriate destination.

RULE 04

Protect Storage

Do not route charge or discharge outside defined storage operating limits.

RULE 05

Fail Safe

If the measurement or control state becomes unreliable, the router should move toward a defined safe state instead of guessing.

ROUTING DECISION MODEL

Observe before switching.

MEASURE CHECK LIMITS CHOOSE PATH SWITCH VERIFY FLOW LOG

FIRST M02 TEST

M02-T01 — Dual Battery Intelligent Transfer

The first M02 test evaluates controlled routing between two separately monitored storage banks and a defined electrical load.

The objective is not to demonstrate perpetual operation. It is to measure how routing decisions affect storage state, conversion losses, available energy and load continuity.

M02-T01 Dual Battery Test
PLANNED
BATTERY A Wh energy state
BATTERY B Wh energy state
LOAD Wh energy delivered
LOSSES Wh routing + conversion

M02-T01 PROCEDURE

Test the router before trusting automation.

01

Establish Starting State

Record Battery A, Battery B, source availability and load conditions.

02

Verify M01

Confirm energy measurement channels are operating before any routing decision is tested.

03

Verify Protection

Confirm fuses, current limits, switching states and emergency-stop behaviour.

04

Select Initial Route

Connect the defined source and storage path using the approved switching sequence.

05

Apply Load

Operate a defined load while recording energy flow.

06

Reach Routing Threshold

Allow the system to reach the predefined condition that calls for a route change.

07

Change Route

Execute the controlled switch to the alternate approved path.

08

Verify Energy Flow

Confirm measured current and energy are moving through the intended path after switching.

09

Compare Losses

Quantify energy used, transferred and lost during the routing process.

10

Repeat

Repeat the sequence before automating the routing rule.

SO-PROTECT

The router must never become the weakest safety layer.

Switching logic does not replace overcurrent protection, suitable wiring, battery protection or appropriate charging control.

The low-voltage prototype should remain fused, current-limited where practical and equipped with an accessible emergency stop.

FAIL-SAFE STATES

Loss of intelligence should not mean loss of control.

SENSOR

Measurement Failure

Stop automatic route changes when the required measurement becomes unreliable.

CTRL

Controller Failure

Return switching devices to a defined safe state where the hardware permits it.

LOW

Low Storage

Preserve critical loads and disconnect experimental loads according to defined thresholds.

STOP

Emergency Stop

Provide a direct way to interrupt the experimental routing system.

M01 + M02

Measurement and routing become one feedback loop.

M01 MEASURES M02 DECIDES SO-SWITCH ACTS M01 VERIFIES SO-RULES LEARNS

A routing decision should be confirmed by measurement after the switch. The command alone does not prove that energy actually followed the intended path.

SOURCE INTEGRATION

The router can grow as new measured sources are added.

SOLAR

Solar Input

Route measured solar energy toward loads or available storage through appropriate charging equipment.

Solar Calculator →
RECOVERY

Regenerative Input

Measure recovered energy independently before routing it back toward an approved destination.

HYDRO

Micro-Hydro Input

Route measured generation from useful water flow through a controlled conversion path.

EXPERIMENT

Experimental Sources

Experimental energy sources remain separately measured so their contribution cannot be confused with primary generation.

RECOVERY BUS

Recovered energy gets its own accounting path.

Regenerative braking, micro-hydro, mechanical recovery or another experimental source can enter the Recovery Bus only after its contribution is measured.

This prevents recovered energy from being mistaken for primary generation.

RECOVERY ACCOUNTING Separate Measurement
R&D
SOURCE ID recovery type
ENERGY Wh recovered
DESTINATION A/B storage or load
LOSS Wh conversion

M02 → CONTROL ROOM

The Control Room should eventually know both energy and route state.

M01 provides measured energy data. M02 adds context about where that energy was intentionally routed.

Future telemetry can therefore show not only how much energy moved, but which source, storage bank or load was active during that period.

Enter Control Room
CURRENT ENERGY MODEL Control Room Snapshot
—
GENERATED — kWh
CONSUMED — kWh
STORED — kWh
RECOVERED — kWh

Route-state telemetry is not connected yet. The values shown here are the existing Sustainable Oasis Control Room energy dataset.

FUTURE M02 DATA RECORD

Every routing decision should leave a trace.

TIME

Timestamp

Record when the routing state changed.

FROM

Source

Identify where energy originated.

TO

Destination

Identify where energy was routed.

Wh

Energy Transferred

Record measured watt-hours transferred during the routing period.

WHY

Trigger

Record which operating rule caused the routing change.

LOSS

Conversion Loss

Record energy lost across converters or charging stages.

M02 DEVELOPMENT PATH

Manual routing first. Automated routing later.

MANUAL MEASURED SWITCHED RULE-BASED LOGGED INTEGRATED
PHASE 1

Manual Routing

Test approved routes manually using M01 measurement.

PHASE 2

Controlled Switching

Add protected electrical switching between validated routes.

PHASE 3

SO-RULES

Add simple rule-based decisions using validated measurements.

PHASE 4

Logging

Record every route change and corresponding energy flow.

PHASE 5

Control Room

Connect route-state and measured energy data to the Sustainable Oasis digital layer.

NEXT MODULE

M01 measures. M02 routes. M03 stores.

Together, the first three modules form the initial physical core of the SO-EMS architecture.

M03 takes the next step by formalizing how energy storage is characterized, protected, charged, discharged and measured.

SO-EMS M02

Measurement tells us what energy exists. Routing decides where it can do the most useful work.